This article explains how ZDHC Approved Wastewater Laboratories can review and submit completed ClearStream test results in the ZDHC Gateway, and what happens after submission.

01/ Introduction

Once all required ClearStream test results have been entered, the laboratory must review and submit them to the supplier. This article explains how to complete the submission, what happens after the results are locked, and how to handle corrections.

For instructions on entering results directly on the platform or uploading them using a CSV file, see How to report ClearStream test results: Manual Entry and CSV Upload (Wastewater Laboratories).

02/ Before submitting

Before submitting your results, make sure that:

  • All required parameters have been completed.
  • The test methods and reported values are correct.
  • Any missing or invalid results have been corrected.
  • Results entered through CSV or Excel upload have been checked, including any errors identified in the Upload Summary.

Tip: Review the results carefully before submitting, as the laboratory cannot independently reopen submitted results.

03/ Reviewing and submitting test results

  1. Open ClearStream in the ZDHC Gateway.
  2. Go to My Projects and open the project in the Reporting stage.

    Image of My Projects view, with Reporting tab highlighted 

    Image of Reporting view, with one project showing. 

  3. From the Reporting stage, complete all required test parameters using your chosen reporting method.

    Image of Reporting view, with Select Type of Data Upload displayed. 

  4. Once all results have been entered, select Review & Submit All to open the submission summary.

    Image of Parameter Groups and Review & Submit All button 

  5. Review the completed parameter counts and check for any missing or invalid results.

    Image of Confirm Test Results Submission displaying the Submission Summary 

  6. If corrections are needed, return to the reporting screen and update the relevant results.
  7. Once all required results are complete and correct, select Confirm to submit the test results, and then select Confirm & Lock Results.

    Image of Confirm button. 

After submission, the results are locked, and the project moves to Pending Supplier Review.

Note: Once results have been submitted, the laboratory cannot edit them unless the supplier sends them back for correction.

04/ What happens after submission?

Once the results have been submitted:

  • The results are locked and can no longer be edited directly by the laboratory.
  • The supplier can review the submitted test results.
  • The project moves to Pending Supplier Review.

The laboratory can still view the submitted information, including the reported values and test methods.

05/ Supplier review and corrections

The supplier has 14 days to review the submitted results.

Supplier action What happens next
Accepts the results The submitted results are accepted, and the ClearStream Report is generated.
Takes no action within 14 days The results are automatically accepted, and the ClearStream Report is generated.
Sends the results back for correction The project returns to the Reporting stage, allowing the laboratory to correct and resubmit the results.

If corrections are requested

  1. Open ClearStream > My Projects.
  2. Find and open the project returned for correction.
  3. Review the requested changes and update the relevant results.
  4. Review the completed results again.
  5. Select Review & Submit All, then Confirm and lock results to resubmit them.

Note: If you identify an error after submission, you cannot reopen the results yourself. The supplier must send them back for correction.

06/ Tips & Notes

Tips:

  • Review before submitting: Check all required parameters and reported values before locking the results.
  • Check the submission summary: Make sure the completed parameter counts match the results you have entered.
  • Correct CSV upload errors first: If you uploaded results using a CSV file, resolve any missing or rejected values before submitting.

Notes:

  • Submitted results are locked: The laboratory cannot make further changes unless the Supplier sends the results back for correction.
  • Supplier review period: The Supplier has 14 days to review submitted results. If no action is taken, the results are automatically accepted.
  • Reporting requirements: The required parameters depend on the Supplier's facility information and the applicable ZDHC Wastewater & Sludge Guidelines.
Last updated: 10 November 2026 15:40
Still need Help?

Let us help you find what you're looking for or connect you to our support team.

Submit a request
Related articles
  • Understanding the ClearStream CSV Upload Summary (Wastewater Laboratories)
  • How to Submit ClearStream Test Results: Manual Entry and CSV Upload (Wastewater Laboratories)
  • Paying for a Supplier's ClearStream Fee Using Vouchers (Wastewater Laboratories)
  • Troubleshooting and frequently asked questions (Wastewater Laboratories)
  • Understanding ClearStream activity log (Wastewater Laboratories)
  • Reviewing the testing parameters (Wastewater Laboratories)
  • How to enter sampling information (Wastewater Laboratories)
  • How to accept or decline a testing request (Wastewater Laboratories)
  • Understanding the My Projects view (Wastewater Laboratories)
Popular articles
  • Sign up for our newsletter.


  • Contact

  • ADDRESS

    Stichting ZDHC Foundation
    Oudezijds Voorburgwal 316-B
    1012 GM Amsterdam
    The Netherlands

  • EMAIL
    support@zdhc.org
  • Legal

  • Disclaimers
  • Resources

  • Submit a request
  • Glossary
  • Engagement
  • Platforms

  • Roadmap to Zero
  • Implementation HUB
  • ZDHC Gateway
  • ZDHC Academy

Privacy Notice
© Stichting ZDHC Foundation. 2023. All rights reserved

Search for articles...