The KPI’s are divided under the 3 areas 

  • ETP Design 
  • Operational Control 
  • Team Competence

Any facility that does not meet one or more ETP Design KPI/s it will be classified as “ALERT” and the final outcome of the ETP Assessment will be classifed as alert. 

If the facility is classified as a non-Alert for the ETP Design KPI’s only, then the facility will be allocated the Level , Level 2 or Level 3 scoring. 

Scoring is as follows:

  • Level 1: 1 point for each KPI met for operational control and team competence. 
  • Level 2: 2 points for each KPI met for operational control and team competence.
  • Level 3: 3 points for each KPI met for operational control and team competence

If the facility is not able to meet the requirements of Level 1, then no scoring will be awarded for that particular KPI of operational control and team competence.

Final outcome based on the scoring
AlertETP process design KPIs are not met. 

If the ZDHC Approved Reviewer categorises the facility as “Alert” based on the ETP Design KPIs, further assessment of KPIs related to operational control and team competence may still be conducted. 

However, this additional assessment will only serve to highlight potential areas for improvement and will not be scored at Levels 1, 2, or 3. In such cases, the final outcome will remain classified as “Alert.”
Level 0Requirements of Level 1 are not met.
Level 1 (19-29 points)ETP process design KPIs are met and the total score is between 19 - 29
Level 2 (30-45 points)ETP process design KPIs are met and the total score is between 30 - 45
Level 3 (46-57 points)ETP process design KPIs are met and the total score is between 46 - 57
Still need Help?

Let us help you find what you're looking for or connect you to our support team.

Submit a request
Related articles
  • What are the assessment areas that falls under the scope of ZDHC ETP Assessment?
  • Which facilities are in scope of the ZDHC ETP Assessment?
  • Which facilities are out of scope of the ZDHC ETP assessment?
  • What are the benefits to stakeholders of the ZDHC ETP assessment?
  • Does the daily threshold limit of 15m3/day affects the ZDHC ETP Assessment?
  • What are the facility requirements for a ZDHC ETP assessment?
  • How long is a ZDHC ETP Assessment Report valid, and how often is an on-site ETP Assessment required?
  • If a facility is awarded as Level 1 can they undertake on-site a re-assessment during the same year to upgrade to Level 2 or Level 3?
  • What does a facility do once they receive the ZDHC ETP Assessment Report?
Popular articles
  • Sign up for our newsletter.


  • Contact

  • ADDRESS

    Stichting ZDHC Foundation
    Oudezijds Voorburgwal 316-B
    1012 GM Amsterdam
    The Netherlands

  • EMAIL
    support@zdhc.org
  • Legal

  • Disclaimers
  • Resources

  • Submit a request
  • Glossary
  • Engagement
  • Platforms

  • Roadmap to Zero
  • Implementation HUB
  • ZDHC Gateway
  • ZDHC Academy

Privacy Notice
© Stichting ZDHC Foundation. 2023. All rights reserved

Search for articles...