What happens if a facility does not conform to the ZDHC Wastewater Guidelines, for example, a tested conventional parameter fails to meet the Foundational Limit?
In this instance, the facility is expected to develop a root cause analysis and corrective action plan with a defined completion date, and submit these in the ZDHC Gateway – Wastewater Module. This must be done within thirty (30) days from the date of the laboratory report.